A first for bolted joints: Hydratight and LRQA
Setting a benchmark for training bolting flange joint technicians with an independent audit to ASME PCC-1-2013 Appendix A. Read more in our case study.
Arla now has real-time insight into their dairy farm's compliance – LRQA
Arla appointed LRQA [LR] to drive quality and gain greater real-time insight into their entire milk supply chain and its compliance levels.
Adding flexibility through remote inspection.
Our innovative solution to a common industry problem delivers true savings for a global manufacturer.
Thales UK: Seeing what’s on the environmental horizon and acting.
Seeing what’s on the environmental horizon and acting. Gap analysis to help meet revised standard, ISO 14001:2015. Read more in our case study.
Doubling power plant production with LRQA
Design appraisal and inspection services to convert a fossil-fired power plant to a Combined Cycle Gas Turbine (CCGT) plant. Read more in our case study.
Making a European power plant out of components from Asia.
Our client needed to be confident about the technical quality control process of its main Engineering, Procurement and Construction (EPC) contractor in Asia.
An industry first in Sweden for AGA Gas.
Risk evaluation to support a new liquefied natural gas (LNG) terminal
EDF Energy relies on LRQA RiskSpectrum to monitor risk at Sizewell B
LRQA's RiskSpectrum suite gives EDF Energy real-time risk monitoring capability, based on a fully validated living PSA model.
Case study - Maintenance cost and risk reduced by 55%.
Maintenance cost and risk reduced by 55%.
Katoni: Make health and safety matter.
Katoni achieves ISO 45001 with LRQA. This case study states the preparation process from OHSAS 18001 to ISO 45001 Katoni took for a successful migration.